2026 Spring Festival Resumption of Work Ceremony

On February 26, 2026 (the 10th day of the first lunar month) E-PAI Hardware Group held its Spring Festival resumption of work ceremony. All departments are now fully operational, and production line is running.

E-PAI Hardware Group

This year, E-PAI Hardware Group is doubling down on quality as its core direction. We are fine-tuning how we use internal resources and continuing to build on our product strengths and service capabilities.

The Group runs two subsidiaries, each handling a different part of the business:

E-Stainless focuses on stainless steel materials. The product line includes stainless steel coils, sheets, tubes, bars, and other processed goods that are used in construction, manufacturing, and by end users.

GripPRO manufactures architectural hardware products. It mainly offers stainless steel door handles, staircases, railings, and bathroom hardware. These are for both engineering projects and the decorative market.

Both subsidiaries work independently and have their own areas of focus. They do, however, share resources for procurement, quality management systems, and supply chain support. This arrangement lets them support each other and grow together. The Group will keep working on integrating the supply chain, improving production and quality management, and expanding our ability to serve international customers with more reliable and professional products and solutions.

E-Stainless: Back to Full Operations

After the holiday, the E-Stainless team is back to work. Everyone on staff is now at their posts, and production is coming back up steadily. The production, quality control, warehousing and sales teams are coordinating effectively with each other and every product line is back up and running.

Before the Spring Festival holiday, we prepared raw materials in advance and arranged the production plan for after the holiday. At present, the supply of main raw materials is stable and the inventory is sufficient. This can support both current orders and new production needs. The supply chain is running smoothly.

After work resumed, we also carried out a full inspection and maintenance of the production equipment to ensure stable operation. Our quality control system has also returned to normal. From raw material inspection to production process control and final product testing, everything follows our standard procedures to ensure stable quality for every batch.

Conclusion

In the past year, we sincerely thank all our partners for your trust and support. With your cooperation, we have maintained steady development in our stainless steel sheets, coils, and tubes business.

In the new year, we look forward to strengthening our communication based on our existing cooperation and working together on more projects and opportunities. We are always willing to provide stable and reliable supply and support according to your actual needs.

Contact Us

Fill out the form below, and we will be in touch shortly.